Windmill Installation

For familiarization and training of bridge crew on jack-up wind farm installation vessels, K-Sim Offshore can offer customized hydrodynamic simulation models with control room instrumentation and integrated KONGSBERG DP2 and jacking system.

This solution enables training in:

  • navigation to location
  • manoeuvring on DP
  • jacking up on site, jacking control
  • pre-loading, stability, leg penetration, leg torsion and inclinometer monitoring
  • emergency preparedness and crisis management, e.g. punch-through
  • procedure development & review
  • communication
  • pre-simulation
  • equipment familiarization