
LIFE EXTENSION OR DECOMMISSIONING
The same advanced KONGSBERG hydroacoustic solutions that enabled the safe and efficient design and installation of the wind farm also help to secure its end of life operations. By delivering the data that decommissioning engineers need to optimise and streamline their tasks, teamed with state-of-the-art positioning systems and integrated operational and digital technologies for heavy lift and support vessels, KONGSBERG systems reduce the risk of accidents and allow for more environmentally friendly working.
Wind Turbine Installation Vessel
Kongsberg Maritime Integrated Solutions for Wind Turbine Installation Vessel (WTIV) represent the most efficient and cost-effective solution of their kind in the market. We secure operational stability and speed and withhold a strong focus on safety throughout challenging operations at the Windfarm field. Our solutions will reduce costs both for CAPEX and OPEX while simultaneously reducing the environmental footprint. Safety are taken care of by enabling optimal positioning of the vessel and crane towards the installation.

Installation & Construction Vessel

INTO THE WIND
Offshore wind farms are set to boom over the next few years, becoming an ever more popular way of meeting the world’s sustainable energy needs. KONGSBERG is providing the state-of-the-art technology solutions needed for this green power revolution.