Construction and installation

Our wind installation vessels offer wind farm developers and vessel operators guaranteed design and efficiency in operations thanks to decades of offshore experience. 

Integrated solutions on wind farm installation vessels  

By integrating engines, propulsion, Dynamic Positioning, navigation, automation, electrical and digital systems, we dramatically reduce the cost and risk of wind turbine installation. Precise data aids situational awareness and decision support, while innovative technology such as an advanced heave-compensated pile gripper and accurate, AUV-assisted positioning for deployed cables reduce cost and increase the safe operational window.

Heavy Lift Construction Vessel

A Heavy lift Construction Vessel performs the initial construction of a wind farm, mounting the monopiles to the bottom and securing the foundation. Our advanced pile gripper guidance system (PGGS) reduces operational time and risk while raising efficiency offshore by executing the complete operation in fully DP mode without anchoring.

Wind Turbine Installation Vessel

Our Wind Turbine Installation Vessel (WTIV) is the most efficient and cost-effective solution of its kind. We secure operational stability and speed, while staying focused on safety, even in challenging offshore operations. Our vessel solutions reduce CAPEX and OPEX while lowering the environmental footprint. 

Cable-laying and cable survey vessels

Our cable-laying and cable survey vessels offer efficient and cost-effective solutions that reduce environmental footprint. We improve safety and efficiency during cable-laying operations due to a unique integration between systems during operation.

Advanced technology and products for wind farm installation and construction vessels