Simrad ES333-7CDK
The Simrad ES333-7CDK is a compact single- or split-beam transducer. The transducer is mainly designed for underwater science applications.
This transducer is available in two different versions:
- ES333-7CDK Single: Single beam version
- ES333-7CDK Split: Split-beam version
Both versions are rated for maximum 1500 meters depth. They are designed to be deployed on submerged platforms for underwater science applications.
The split-beam version offers three individual sectors.
The beamwidth is 7 degrees at its nominal operational frequency.
The compact size and weight of the ES333-7CDK allows it to be mounted on a large variety of subsea platforms. The transducer is provided with two meters cable, and the cable is terminated with an eight-pin male connector that fits directly into our range of subsea transceivers.
The transducer is thus especially well suited for use with autonomous and subsea products such as the WBAT (Wide Band Autonomous Transceiver), WBT Mini and WBT Tube.
Technical specifications
See Downloads section (below)
Order information
To order the transducer, or any of the optional items provided with it, contact your local dealer. If you do not have a regular dealer, a list of all our distributors and dealers can be found on this website. Your dealer will also be able to help you with a detailed quotation including price and delivery information.
Product | Order number | In the box |
---|---|---|
Simrad ES333-7CDK Split | 421259 | Transducer with cable and 8-pin male connector Documents |
Optional items
The order number for the extension cable is included in case the cable fitted to the transducer is too short.
Product | Order number | In the box |
---|---|---|
Transducer extension cable | 423127 | Cable, 10 meters, with male and female plugs |
Services et support
24/7 Technical support
Our 24/7 technical support team is there to help at any time, day or night, wherever your vessel is.
Contact us:
- Contact form
- Phone: +47 33 03 24 07
- Email:
Spares
We understand the importance of having the right parts, available in the right place, at the right time.
Training
Ensure that your crew is properly and thoroughly trained. This will reduce operational risk, downtime and maximise return on asset investment.