Facilities
Kongsberg has a 5000 square metre manufacturing facility for advanced composites. The facility opened in 2001 following significant investment in equipment, building and infrastructure and built on Kongsberg heritage since the mid nineteen seventies. The layout has been planned in order to maximise the cost effectiveness through optimum processs flow.
|